> For the complete documentation index, see [llms.txt](https://testinium.gitbook.io/enterprise-test-automation-docs/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://testinium.gitbook.io/enterprise-test-automation-docs/reports/instant-reports.md).

# Instant Reports

***Instant Reports*** is a reporting screen that provides instant graphical reports.

## Daily Basis Report

***Daily Basis Report*** provides a report of a test result run on the system according to a specified date.

The following steps are followed to prepare this report;

1. Enter the following fields;

* Project List
* Report Date
* Status
* Add Usage Gauge

<figure><img src="/files/OUxLR2ilQmdOr00rMwO4" alt=""><figcaption></figcaption></figure>

2. Click the ***Prepare Report*** button or ***Prepare Environment Report*** button.

After this stage, ***Download*** buttons screens are available to download the report in the desired format. Reports can be downloaded in pdf and excel format.

<figure><img src="/files/8JwJmzDMl9BlKMpmz30S" alt=""><figcaption></figcaption></figure>

## Date Range Basis Report

***Date Range Basis Report*** is a reporting screen that allows test reports to be downloaded from this screen in the system with a maximum date range of 1 month.

The following steps are followed to prepare this report;

1. Enter the following fields;

* Project List
* Starr Date, End Date
* Status

<figure><img src="/files/PR80ijVc8ttDN9SJLKu0" alt=""><figcaption></figcaption></figure>

2. Click the ***Prepare Report*** button or ***Prepare Environment Report*** button.

After this stage, ***Download*** buttons screens are available to download the report in the desired format. Reports can be downloaded in pdf and excel format.
