Date Range Basis Report
Last updated
Last updated
Test reports can be downloaded from this screen in the system with a maximum date range of 1 month.
On the screen that opens;
Project List
Start Date
End Date
Status
The values are selected or the Prepare Report or Prepare Environment Report button is pressed after selecting the Project and the Date (Maximum 1 Month period).
The system prepares the relevant file and the Download button appears. The user downloads the report to their computer by clicking the Download button.