# New Tag

To create a new tag, follow the steps below;

1. Click the ***Run with Tag*** button on the plan list screen.
2. Click the ***New Tag*** button on the Tag List screen.
3. Name the tag.
4. Select a project.
5. Move the plans that will run with the tag of the selected project from **Source** list to **Target** list.

![](https://1258413245-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fz8xU8NRvPGqgBhcaWC4z%2Fuploads%2FApRrFr7dq91r57MJJpqm%2FScreenshot%202025-03-03%20at%2008.08.57.png?alt=media\&token=02112ff3-1668-4ced-952f-80cf99eae2aa)

6. Click the ***Next*** button if Scheduling is to be done after the desired plans have been moved to the Target field.
7. Enter the required fields in the Schedule screen that opens.

<figure><img src="https://1258413245-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fz8xU8NRvPGqgBhcaWC4z%2Fuploads%2FdBI3WHp73T4pSKGIBYDk%2FScreenshot%202025-03-03%20at%2008.10.22.png?alt=media&#x26;token=36fa2543-a8a0-4019-8dfe-13ca7b4e0b2d" alt=""><figcaption></figcaption></figure>
